The Northern Road Axis of Crete is a landmark motorway project that will transform transportation across the island, creating a safer, faster, and more efficient corridor linking Crete’s major urban centers, ports, airports, and tourist destinations. Once completed, it will significantly enhance road safety, reduce travel times, improve regional accessibility, and support the sustainable development of Crete for decades to come.
TERNA’s involvement includes the construction of two key sections of the motorway, namely Chania–Heraklion and Hersonissos–Neapoli Sections, contributing to the development of a modern high-capacity road network designed to meet the island’s growing mobility and economic needs.
Key Highlights of Hersonissos–Neapoli Section
- Total length:22.44 km The section is divided into two road subsections:
- Road Section A Hersonissos–S2 tunnel: 16.38 km, starting 720 m east of Kasteli Interchange and ending inside the S2 tunnel (after 1.200m from the entrance portal).
- Road Section B S2 tunnel–Neapoli: 6.06 km, starting after 1200m from S2 tunnel and ending northwest of Neapoli, approximately 1 km from the settlement.
TERNA undertook the construction of Project Section A.
- Road Cross-Section: Dual carriageway with 2 traffic lanes per direction, emergency lane (hard shoulder), and central median barrier
- Major Engineering Works: 2 tunnels, 4 bridges, 15 underpasses and 2 overpasses (across the entire axis)
- Interchanges: 4 grade-separated interchanges (Hersonissos, Stalida, Mallia, Sisi)