Engineering, Procurement & Construction (EPC), on behalf of HERON II, of a Combined Cycle Power Plant with a nominal capacity of 435 MW at ISO conditions. The Plant includes STAG 109FB GE main equipment in single shaft arrangement using dry low NOx combustion system. The project includes complete engineering, permitting, procurement, transportation, construction, erection, commissioning and site training.