Construction of a double railway tunnel with a length of 1.222m and an excavation cross-section of 113,62m².
Technical and earthworks for the infrastructure of the 12km long double railway line. Including 110m. valley bridges, 2,350m. bridges, 15 technical, 7 underpasses and 415m. cut & cover sections.