Reconstruction and Electrification of the Dimitrovgrad – Svilengrad Railway Line
Study and construction of a high-speed railway line including electrification, between the stations Dimitrovgrad – Harmanli, with a total length of approximately 36 km (from km 231.560 at the Yabalkovo – Dimitrovgrad junction to km 266.000 at the Simeonovgrad – Harmanli junction). The contract also includes the construction of the Dimitrovgrad and Simeonovgrad stations, as well as all intermediate stops.