The company is developing, as an independent producer, the Small Ladonas Hydroelectric Project, with a capacity of 10 MW. The contract includes carrying out preliminary works related to water control at the headworks, at the tunnel inlet and outlet faces, as well as at the tailrace canal downstream of the Power Station.

The scope also includes performing topographic surveys and the necessary clearing of the project area, as well as any additional supplementary works required.

Project Contractor: TERNA S.A.
Client / Project Owner: DEI Renewables – TERNA Energy S.A.

STATUS

Completed

COUNTRY

Greece

CATEGORY

Energy