MOTORWAYS

Nea Odos

Nea Odos concession project, with a total length of 380 km, is divided into two main sections and includes:

  • Ionia Odos motorway of an approximate length of 196 km. from the end of Ch. Trikoupis" bridge in Antirrio to Egnatia Odos near Ioannina (Egnatia Odos I/C).
  • Part of PATHE motorway of an approximate length of 172,5 km from Metamorphossi I/C (area of Attiki Odos) to Skarfia - after Kamena Vourla - and PATHE connecting branch Schimatari - Chalkida of a total length of 11 km.

Concession Term: 30 years

Read more >>

Kentriki Odos

Central Greece Motorway ( E - 65)

Kentriki Odos has undertaken planning, construction, exploitation, operation, and maintenance of the ‘Aftokinitodromos Kentrikis Ellados – E65’ Concession project.

This 238.5 km project is of strategic importance for Greece’s growth and concerns the management and maintenance of the section of the ATHE motorway from Skarfia to Raches-Fthiotida (total length of 57 km), as well as the construction of Aftokinitodromos Kentrikis Ellados (E65 – Central Greece Motorway), which starts from the semi-I/C by the same name on the A.Th.E.Add a new co motorway at the Thermopyles I/C, and reaches Egnatia Odos at the I/C 15 km west of Grevena. (total length 181.5 km).

The section of the motorway from Skarfia to Raches went into operation in 2015 and solved the major issue of road safety on the ‘Horseshoe of Maliakos’. Drivers can now use a modern, high specification motorway with 2 traffic lanes per direction, plus the Emergency Lane, three (3) twin-branch tunnels, five (5) viaducts, and high-spec infrastructure.

Aftokinitodromos Kentrikis Ellados (E65) is being constructed on a completely new layout design and essentially connects Eastern and Western Greece. Its design is based on modern national and European standards, respectful of the natural and human-made environment, aiming at driver safety and comfort, and saving as much time and fuel as possible. Indicatively, upon its completion, the journey from Lamia to Egnatia will take 1 hour and 30 minutes, instead of the current 2 hours and 30 minutes.

Currently, a 136-km section of E65 is operational, between the A.Th.E. highway I/C (206.5 km) and Kalampaka I/C, through which the journey Athens – Karditsa takes 2 hours and 35 minutes, while Athens – Trikala, less than 3 hours. Additionally, important tourist destinations such as Meteora and Lake Plastiras are accessible quickly, easily, and safely.

At the same time, the construction of the remaining northern section of the highway from Kalampaka I/C to Egnatia Odos I/C, approximately 15 km west of Grevena, is in full swing.

Concession term: 30 years

Read more >>

Olympia Odos

OLYMPIA ODOS S.A. is the company selected by the Greek Ministry of Public Works to design, finance, construct, operate and maintain the Olympia Odos motorway.

Concession term: 30 years

GEK TERNA’s participation: 17%

Egnatia Odos

GEK TERNA SA. (75%) - EGIS PROJECTS S.A. (25%) consortium was declared as the Preferred Bidder for the concession agreement regarding the operation and exploitation of Egnatia Odos Motorway and the three vertical road axes for a concession period of 35 years.

Concession term: 35 years

GEK TERNA’s participation:75%


 
Northern Road Axis of Crete - Hersonisos - Neapoli section

Concession term: 30 years

GEK TERNA’s participation:55%



 
Attiki Odos

Concession term: 25 years